American Institute of Chemical Engineers (Aiche)
Aiche Equipment Testing Procedure - Tray Distillation Columns
A Guide to Performance Evaluation
American Institute of Chemical Engineers (Aiche)
Aiche Equipment Testing Procedure - Tray Distillation Columns
A Guide to Performance Evaluation
- Broschiertes Buch
- Merkliste
- Auf die Merkliste
- Bewerten Bewerten
- Teilen
- Produkt teilen
- Produkterinnerung
- Produkterinnerung
Special Details: Equipment Testing Procedure. Softcover Member and other discounts do not apply to this title.
Andere Kunden interessierten sich auch für
- American Institute of Chemical Engineers (Aiche)Aiche Equipment Testing Procedure - Trayed and Packed Columns65,99 €
- American Institute of Chemical Engineers (Aiche)Aiche Equipment Testing Procedure - Particle Size Classifiers120,99 €
- Lloyd E BrownellProcess Equipment Design669,99 €
- Process Plant Equipment197,99 €
- Daniel BenekeUnderstanding Distillation Using Column Profile Maps197,99 €
- Cecil L. SmithDistillation Control118,99 €
- William L. LuybenDistillation Simulation, 2e166,99 €
-
-
-
Special Details: Equipment Testing Procedure. Softcover Member and other discounts do not apply to this title.
Hinweis: Dieser Artikel kann nur an eine deutsche Lieferadresse ausgeliefert werden.
Hinweis: Dieser Artikel kann nur an eine deutsche Lieferadresse ausgeliefert werden.
Produktdetails
- Produktdetails
- Verlag: Wiley
- 2nd edition
- Seitenzahl: 32
- Erscheinungstermin: 15. November 1987
- Englisch
- Abmessung: 280mm x 216mm x 2mm
- Gewicht: 116g
- ISBN-13: 9780816904044
- ISBN-10: 0816904049
- Artikelnr.: 29757279
- Herstellerkennzeichnung
- Libri GmbH
- Europaallee 1
- 36244 Bad Hersfeld
- 06621 890
- Verlag: Wiley
- 2nd edition
- Seitenzahl: 32
- Erscheinungstermin: 15. November 1987
- Englisch
- Abmessung: 280mm x 216mm x 2mm
- Gewicht: 116g
- ISBN-13: 9780816904044
- ISBN-10: 0816904049
- Artikelnr.: 29757279
- Herstellerkennzeichnung
- Libri GmbH
- Europaallee 1
- 36244 Bad Hersfeld
- 06621 890
The AMERICAN INSTITUTE OF CHEMICAL ENGINEERS (AIChE) is a distinguished professional association that strives to provide leadership in the advancing chemical engineering profession. The Equipment Testing Procedures Committee is composed of engineers with substantial experience in the design and operation of process plants, as well as in solving problems that can arise with the equipment used in these plants.
Chapter 1. Purpose and Scope.
Purpose.
Scope.
Liability.
Chapter 2. Definitions and Descriptions of Terms.
Flow Quantities.
Key components.
Tray Efficiency.
Operating Lines.
Pinch.
Maximum Throughput.
Minimum Throughput.
Operating Section.
Chapter 3. Test Planning.
Safety.
Environmental.
Preliminary Preparation.
Test Objectives.
Organizational Resources.
Schedule.
Column Control and Instrumentation.
Peripheral Equipment.
Pretest Calculations.
Types of Tests.
Performance Tests.
Acceptance Tests.
Specific Areas of Interest.
Tray Efficiency.
Capacity Limitations.
Energy Consumption.
Pressure-Drop Restrictions.
Data requirements-Measured.
Properties of External Streams, Overall and Component Material Balances,
Over Enthalpy Balances.
Internal Temperatures.
Internal Samples.
Pressure Profiles.
Data Requirements-Physical Properties.
Essential Data.
Auxiliary Data.
Test Procedure Documentation.
Chapter 4. Methods of Measurement and Sampling.
Measurement of Temperatures.
Accuracy.
Errors.
Measurement of Flow Rates.
Orifice Meters.
Rotameters.
Direct Volume or Weight Measurement.
Measurement of Column Pressure Drop.
Instruments.
Pressure taps.
Seal Pots.
Accuracy.
Sampling Procedures.
General.
Selection of Sampling Points.
Sample Connections.
Containers.
Sampling of High Boiling Materials.
Sampling of Intermediate Boiling Materials.
Sampling of Materials Having Boiling Points Below -50o F (-46oC).
Labeling and Handling of the Samples.
Chapter 5. Test Procedure.
Preliminary.
Pretest Procedure for Maximum Hydraulic Throughput.
Reaching the Flooding Point.
Capacity Test.
Test Period.
Establishment of Steady State Conditions.
Length of Test Period.
Chapter 6. Computation of Results.
Verification of Test Data.
Material Balance.
Enthalpy Balance.
Overall Balance.
Internal Flow Rates.
Column Capacity.
Column Pressure Drop.
Overall Column Efficiency.
Computer Calculation.
Graphical Calculation.
Murphree Tray Efficiency.
Sample Calculations.
Chapter 7. Interpretation of Results.
Sources of Experimental Error.
Effects of Experimental Error.
Possible Reasons for Not Meeting Design Performance.
Mechanical.
Process.
Applications of Test results to Design Conditions.
Chapter 8. Appendix.
Notation.
Illustrations.
Sample Calculation.
English Units.
SI Units.
References.
Purpose.
Scope.
Liability.
Chapter 2. Definitions and Descriptions of Terms.
Flow Quantities.
Key components.
Tray Efficiency.
Operating Lines.
Pinch.
Maximum Throughput.
Minimum Throughput.
Operating Section.
Chapter 3. Test Planning.
Safety.
Environmental.
Preliminary Preparation.
Test Objectives.
Organizational Resources.
Schedule.
Column Control and Instrumentation.
Peripheral Equipment.
Pretest Calculations.
Types of Tests.
Performance Tests.
Acceptance Tests.
Specific Areas of Interest.
Tray Efficiency.
Capacity Limitations.
Energy Consumption.
Pressure-Drop Restrictions.
Data requirements-Measured.
Properties of External Streams, Overall and Component Material Balances,
Over Enthalpy Balances.
Internal Temperatures.
Internal Samples.
Pressure Profiles.
Data Requirements-Physical Properties.
Essential Data.
Auxiliary Data.
Test Procedure Documentation.
Chapter 4. Methods of Measurement and Sampling.
Measurement of Temperatures.
Accuracy.
Errors.
Measurement of Flow Rates.
Orifice Meters.
Rotameters.
Direct Volume or Weight Measurement.
Measurement of Column Pressure Drop.
Instruments.
Pressure taps.
Seal Pots.
Accuracy.
Sampling Procedures.
General.
Selection of Sampling Points.
Sample Connections.
Containers.
Sampling of High Boiling Materials.
Sampling of Intermediate Boiling Materials.
Sampling of Materials Having Boiling Points Below -50o F (-46oC).
Labeling and Handling of the Samples.
Chapter 5. Test Procedure.
Preliminary.
Pretest Procedure for Maximum Hydraulic Throughput.
Reaching the Flooding Point.
Capacity Test.
Test Period.
Establishment of Steady State Conditions.
Length of Test Period.
Chapter 6. Computation of Results.
Verification of Test Data.
Material Balance.
Enthalpy Balance.
Overall Balance.
Internal Flow Rates.
Column Capacity.
Column Pressure Drop.
Overall Column Efficiency.
Computer Calculation.
Graphical Calculation.
Murphree Tray Efficiency.
Sample Calculations.
Chapter 7. Interpretation of Results.
Sources of Experimental Error.
Effects of Experimental Error.
Possible Reasons for Not Meeting Design Performance.
Mechanical.
Process.
Applications of Test results to Design Conditions.
Chapter 8. Appendix.
Notation.
Illustrations.
Sample Calculation.
English Units.
SI Units.
References.
Chapter 1. Purpose and Scope.
Purpose.
Scope.
Liability.
Chapter 2. Definitions and Descriptions of Terms.
Flow Quantities.
Key components.
Tray Efficiency.
Operating Lines.
Pinch.
Maximum Throughput.
Minimum Throughput.
Operating Section.
Chapter 3. Test Planning.
Safety.
Environmental.
Preliminary Preparation.
Test Objectives.
Organizational Resources.
Schedule.
Column Control and Instrumentation.
Peripheral Equipment.
Pretest Calculations.
Types of Tests.
Performance Tests.
Acceptance Tests.
Specific Areas of Interest.
Tray Efficiency.
Capacity Limitations.
Energy Consumption.
Pressure-Drop Restrictions.
Data requirements-Measured.
Properties of External Streams, Overall and Component Material Balances,
Over Enthalpy Balances.
Internal Temperatures.
Internal Samples.
Pressure Profiles.
Data Requirements-Physical Properties.
Essential Data.
Auxiliary Data.
Test Procedure Documentation.
Chapter 4. Methods of Measurement and Sampling.
Measurement of Temperatures.
Accuracy.
Errors.
Measurement of Flow Rates.
Orifice Meters.
Rotameters.
Direct Volume or Weight Measurement.
Measurement of Column Pressure Drop.
Instruments.
Pressure taps.
Seal Pots.
Accuracy.
Sampling Procedures.
General.
Selection of Sampling Points.
Sample Connections.
Containers.
Sampling of High Boiling Materials.
Sampling of Intermediate Boiling Materials.
Sampling of Materials Having Boiling Points Below -50o F (-46oC).
Labeling and Handling of the Samples.
Chapter 5. Test Procedure.
Preliminary.
Pretest Procedure for Maximum Hydraulic Throughput.
Reaching the Flooding Point.
Capacity Test.
Test Period.
Establishment of Steady State Conditions.
Length of Test Period.
Chapter 6. Computation of Results.
Verification of Test Data.
Material Balance.
Enthalpy Balance.
Overall Balance.
Internal Flow Rates.
Column Capacity.
Column Pressure Drop.
Overall Column Efficiency.
Computer Calculation.
Graphical Calculation.
Murphree Tray Efficiency.
Sample Calculations.
Chapter 7. Interpretation of Results.
Sources of Experimental Error.
Effects of Experimental Error.
Possible Reasons for Not Meeting Design Performance.
Mechanical.
Process.
Applications of Test results to Design Conditions.
Chapter 8. Appendix.
Notation.
Illustrations.
Sample Calculation.
English Units.
SI Units.
References.
Purpose.
Scope.
Liability.
Chapter 2. Definitions and Descriptions of Terms.
Flow Quantities.
Key components.
Tray Efficiency.
Operating Lines.
Pinch.
Maximum Throughput.
Minimum Throughput.
Operating Section.
Chapter 3. Test Planning.
Safety.
Environmental.
Preliminary Preparation.
Test Objectives.
Organizational Resources.
Schedule.
Column Control and Instrumentation.
Peripheral Equipment.
Pretest Calculations.
Types of Tests.
Performance Tests.
Acceptance Tests.
Specific Areas of Interest.
Tray Efficiency.
Capacity Limitations.
Energy Consumption.
Pressure-Drop Restrictions.
Data requirements-Measured.
Properties of External Streams, Overall and Component Material Balances,
Over Enthalpy Balances.
Internal Temperatures.
Internal Samples.
Pressure Profiles.
Data Requirements-Physical Properties.
Essential Data.
Auxiliary Data.
Test Procedure Documentation.
Chapter 4. Methods of Measurement and Sampling.
Measurement of Temperatures.
Accuracy.
Errors.
Measurement of Flow Rates.
Orifice Meters.
Rotameters.
Direct Volume or Weight Measurement.
Measurement of Column Pressure Drop.
Instruments.
Pressure taps.
Seal Pots.
Accuracy.
Sampling Procedures.
General.
Selection of Sampling Points.
Sample Connections.
Containers.
Sampling of High Boiling Materials.
Sampling of Intermediate Boiling Materials.
Sampling of Materials Having Boiling Points Below -50o F (-46oC).
Labeling and Handling of the Samples.
Chapter 5. Test Procedure.
Preliminary.
Pretest Procedure for Maximum Hydraulic Throughput.
Reaching the Flooding Point.
Capacity Test.
Test Period.
Establishment of Steady State Conditions.
Length of Test Period.
Chapter 6. Computation of Results.
Verification of Test Data.
Material Balance.
Enthalpy Balance.
Overall Balance.
Internal Flow Rates.
Column Capacity.
Column Pressure Drop.
Overall Column Efficiency.
Computer Calculation.
Graphical Calculation.
Murphree Tray Efficiency.
Sample Calculations.
Chapter 7. Interpretation of Results.
Sources of Experimental Error.
Effects of Experimental Error.
Possible Reasons for Not Meeting Design Performance.
Mechanical.
Process.
Applications of Test results to Design Conditions.
Chapter 8. Appendix.
Notation.
Illustrations.
Sample Calculation.
English Units.
SI Units.
References.