32,99 €
inkl. MwSt.
Versandkostenfrei*
Versandfertig in 6-10 Tagen
  • Broschiertes Buch

Past few years, Saudi Arabia has been aggressive to create the suitable environment and appropriate opportunities to activate and maximize the developmental role of the private sector through the provision of motivating legislations.That gives the private sector promissing investment opportunities and enhances its role in economic development. BOOT contracting system had been, recently, widely used by private sectors in Saudi Arabia.BOOT contract has plenty of challenging such as Saudization,and internal logistics. This book tries to discuss a case study of BOOT contract on power…mehr

Produktbeschreibung
Past few years, Saudi Arabia has been aggressive to create the suitable environment and appropriate opportunities to activate and maximize the developmental role of the private sector through the provision of motivating legislations.That gives the private sector promissing investment opportunities and enhances its role in economic development. BOOT contracting system had been, recently, widely used by private sectors in Saudi Arabia.BOOT contract has plenty of challenging such as Saudization,and internal logistics. This book tries to discuss a case study of BOOT contract on power generation.The significance of this study comes from the importance of securing BOOT Contract in the power generation field for the success of forthcoming BOOT projects and the pioneer application in Saudi Arabia. The study, also, indicates that there is a big economical advantages for the investors due to low fuel gas cost on Saudi Arabia. In brief the book covers the current experience of BOOT contractsystem on Power generation in Saudi Arabia on case study basis. it spot light on the challanges and the potentials.
Autorenporträt
Master in CEM and BS in CHE;studied at KFUPM.Sr. Project Engineer (A)in Saudi Aramco with 20 years experience. Ameer worked on several companies, namely SABIC,NALCO,and others.He was Plant manager on first operated BOOT generation plant on S Aramco. he had exposed to engineering companies management such as Linde,Mitsui,S&W,KTI,and Technip