
Design Approach and Construction of H-Joints Steel Pipe Sheet Piles
A Case of Bridge Piers and Coastal Waste Disposal Landfills
Versandkostenfrei!
Versandfertig in 6-10 Tagen
49,99 €
inkl. MwSt.
PAYBACK Punkte
25 °P sammeln!
This book introduces two new joints, the H-joint and H-H joint, in steel pipe sheet piles (SPSP), to address problems related to traditional joints, the P-P, L-T and P-T joints. A design approach and construction method for the H-joint SPSP were proposed after conducting centrifugal model tests, laboratory tests, field full-scale tests and parametric studies using frame analysis method. Field full-scale tests were conducted to check the practicality of constructing H-joint SPSP, assess construction accuracy and demonstrate that the existing pile driving methods can easily be applied. A method ...
This book introduces two new joints, the H-joint and H-H joint, in steel pipe sheet piles (SPSP), to address problems related to traditional joints, the P-P, L-T and P-T joints. A design approach and construction method for the H-joint SPSP were proposed after conducting centrifugal model tests, laboratory tests, field full-scale tests and parametric studies using frame analysis method. Field full-scale tests were conducted to check the practicality of constructing H-joint SPSP, assess construction accuracy and demonstrate that the existing pile driving methods can easily be applied. A method of joining two long H-jointed pile was tested and is given. Full-scale tension tests and hydraulic conductivity tests of H-H joint were conducted with a view to applying it as a cutoff barrier in the construction of coastal waste disposal landfills. Performance of a proposed water-swelling paint was evaluated by hydraulic conductivity techniques and was found to meet technical standards evenafter 75% of the paint coat is lost.