Caroline T. W. Chan
Estimating and Measurement for Simple Building Works in Hong Kong
Caroline T. W. Chan
Estimating and Measurement for Simple Building Works in Hong Kong
- Broschiertes Buch
- Merkliste
- Auf die Merkliste
- Bewerten Bewerten
- Teilen
- Produkt teilen
- Produkterinnerung
- Produkterinnerung
This book is an introductory text on building measurement and estimating for simple buildings in Hong Kong, based on the Hong Kong Standard Method of Measurement, 4th Edition, Revised 2018 (HKSMM4 Rev 2018).
Andere Kunden interessierten sich auch für
- Martin BrookEstimating and Tendering for Construction Work50,99 €
- Rachel TennantProfessional Practice for Landscape Architects42,99 €
- Citizenship, Identity and Social Movements in the New Hong Kong62,99 €
- Allan Ashworth (UK University of Salford)Cost Studies of Buildings89,99 €
- Wei LiPublic Administration in Hong Kong55,99 €
- Iam-chong IpHong Kong's New Identity Politics45,99 €
- Routledge Handbook of Contemporary Hong Kong50,99 €
-
-
-
This book is an introductory text on building measurement and estimating for simple buildings in Hong Kong, based on the Hong Kong Standard Method of Measurement, 4th Edition, Revised 2018 (HKSMM4 Rev 2018).
Produktdetails
- Produktdetails
- Verlag: Taylor & Francis Ltd
- Seitenzahl: 386
- Erscheinungstermin: 31. Dezember 2020
- Englisch
- Abmessung: 246mm x 174mm x 21mm
- Gewicht: 668g
- ISBN-13: 9780367862329
- ISBN-10: 0367862328
- Artikelnr.: 59985589
- Herstellerkennzeichnung
- Libri GmbH
- Europaallee 1
- 36244 Bad Hersfeld
- gpsr@libri.de
- Verlag: Taylor & Francis Ltd
- Seitenzahl: 386
- Erscheinungstermin: 31. Dezember 2020
- Englisch
- Abmessung: 246mm x 174mm x 21mm
- Gewicht: 668g
- ISBN-13: 9780367862329
- ISBN-10: 0367862328
- Artikelnr.: 59985589
- Herstellerkennzeichnung
- Libri GmbH
- Europaallee 1
- 36244 Bad Hersfeld
- gpsr@libri.de
Caroline T.W. Chan is a lecturer in the City University of Hong Kong, teaching sub-degree students in the Architectural, Engineering and Construction (AEC) programmes. Caroline is a qualified Quantity Surveyor and, before joining academia, she practised in large Quantity Surveryor consultancy firms and large contractors in Hong Kong.
Part 1: Building the Project Team; 1. Introduction 2. Principal
Stakeholders of a Project Part 2: Deciding the Procurement Strategy; 3.
Project Delivery Methods 4. Payment Mechanisms Part 3: Preparing for
Tender; 5. Tendering Methods 6. Tendering Procedures 7. Tender
Documentation 8. Approximate Estimating Techniques in Pre-Contract Stages
Part 4: Measuring Quantities; 9. Principles and Rules of Taking-off 10.
Length, Area and Volume Measurement 11. Introduction to HKSMM4 Rev 2018 12.
Measurement of Excavation 13. Measurement of Concrete Works 14. Measurement
of Brickwork and Blockwork 15. Measurement of Wood Works 16. Measurement of
Steel and Metal Works 17. Measurement of Plastering, Paving and Painting
18. Measurement of Waterproofing 19. Worked Examples 20. Processing
Measurements Part 5: Estimating Unit Rates; 21. Pricing in General 22.
Pricing Trade Work 23. Pricing Preliminaries 24. Computer Applications in
Measurement and Estimating
Stakeholders of a Project Part 2: Deciding the Procurement Strategy; 3.
Project Delivery Methods 4. Payment Mechanisms Part 3: Preparing for
Tender; 5. Tendering Methods 6. Tendering Procedures 7. Tender
Documentation 8. Approximate Estimating Techniques in Pre-Contract Stages
Part 4: Measuring Quantities; 9. Principles and Rules of Taking-off 10.
Length, Area and Volume Measurement 11. Introduction to HKSMM4 Rev 2018 12.
Measurement of Excavation 13. Measurement of Concrete Works 14. Measurement
of Brickwork and Blockwork 15. Measurement of Wood Works 16. Measurement of
Steel and Metal Works 17. Measurement of Plastering, Paving and Painting
18. Measurement of Waterproofing 19. Worked Examples 20. Processing
Measurements Part 5: Estimating Unit Rates; 21. Pricing in General 22.
Pricing Trade Work 23. Pricing Preliminaries 24. Computer Applications in
Measurement and Estimating
Part 1: Building the Project Team; 1. Introduction 2. Principal
Stakeholders of a Project Part 2: Deciding the Procurement Strategy; 3.
Project Delivery Methods 4. Payment Mechanisms Part 3: Preparing for
Tender; 5. Tendering Methods 6. Tendering Procedures 7. Tender
Documentation 8. Approximate Estimating Techniques in Pre-Contract Stages
Part 4: Measuring Quantities; 9. Principles and Rules of Taking-off 10.
Length, Area and Volume Measurement 11. Introduction to HKSMM4 Rev 2018 12.
Measurement of Excavation 13. Measurement of Concrete Works 14. Measurement
of Brickwork and Blockwork 15. Measurement of Wood Works 16. Measurement of
Steel and Metal Works 17. Measurement of Plastering, Paving and Painting
18. Measurement of Waterproofing 19. Worked Examples 20. Processing
Measurements Part 5: Estimating Unit Rates; 21. Pricing in General 22.
Pricing Trade Work 23. Pricing Preliminaries 24. Computer Applications in
Measurement and Estimating
Stakeholders of a Project Part 2: Deciding the Procurement Strategy; 3.
Project Delivery Methods 4. Payment Mechanisms Part 3: Preparing for
Tender; 5. Tendering Methods 6. Tendering Procedures 7. Tender
Documentation 8. Approximate Estimating Techniques in Pre-Contract Stages
Part 4: Measuring Quantities; 9. Principles and Rules of Taking-off 10.
Length, Area and Volume Measurement 11. Introduction to HKSMM4 Rev 2018 12.
Measurement of Excavation 13. Measurement of Concrete Works 14. Measurement
of Brickwork and Blockwork 15. Measurement of Wood Works 16. Measurement of
Steel and Metal Works 17. Measurement of Plastering, Paving and Painting
18. Measurement of Waterproofing 19. Worked Examples 20. Processing
Measurements Part 5: Estimating Unit Rates; 21. Pricing in General 22.
Pricing Trade Work 23. Pricing Preliminaries 24. Computer Applications in
Measurement and Estimating