22,99 €
inkl. MwSt.

Versandfertig in 6-10 Tagen
payback
11 °P sammeln
  • Broschiertes Buch

Please note that the content of this book primarily consists of articles available from Wikipedia or other free sources online. The King Fahd Causeway is a causeway connecting Saudi Arabia and Bahrain. Construction started during 1968 and continued until 1986, when it was officially opened to the public. The project cost a total of US$1.2 billion (SAR3 billion). One of the major contractors of the project is Ballast Nedam Group, based in the Netherlands. The four-lane road is 28 km (17 mi) long and approximately 23 m (75 ft) wide, and was built using 350,000 m2 (3,800,000 sq ft) of concrete along with 47,000 metric tonnes of reinforced steel.…mehr

Andere Kunden interessierten sich auch für
Produktbeschreibung
Please note that the content of this book primarily consists of articles available from Wikipedia or other free sources online. The King Fahd Causeway is a causeway connecting Saudi Arabia and Bahrain. Construction started during 1968 and continued until 1986, when it was officially opened to the public. The project cost a total of US$1.2 billion (SAR3 billion). One of the major contractors of the project is Ballast Nedam Group, based in the Netherlands. The four-lane road is 28 km (17 mi) long and approximately 23 m (75 ft) wide, and was built using 350,000 m2 (3,800,000 sq ft) of concrete along with 47,000 metric tonnes of reinforced steel.