73,99 €
inkl. MwSt.
Versandkostenfrei*
Versandfertig in 1-2 Wochen
payback
37 °P sammeln
  • Gebundenes Buch

Every industry has its own indices, metrics, measures, and KPIs they use on maintenance. The main reason why we measure these indices is to determine if our maintenance organization is moving forward in the right direction. However, some indices may not be as simple as we think. This book is not just about knowing the formulas, and equations to use but having a deeper understanding of what we include and exclude in them. Some of these includes: ¿ What formula are we using on Availability, especially when calculating OEE? ¿ If a shipment was returned to the plant because of defects, is the…mehr

Produktbeschreibung
Every industry has its own indices, metrics, measures, and KPIs they use on maintenance. The main reason why we measure these indices is to determine if our maintenance organization is moving forward in the right direction. However, some indices may not be as simple as we think. This book is not just about knowing the formulas, and equations to use but having a deeper understanding of what we include and exclude in them. Some of these includes: ¿ What formula are we using on Availability, especially when calculating OEE? ¿ If a shipment was returned to the plant because of defects, is the Quality Rate adjusted on the date the product was manufactured? ¿ If the machine is not loaded and sitting Idle, is the No-Load included as a Planned Downtime? ¿ Is maintenance in agreement with this that no load is a Planned Downtime? ¿ Is set-up and changeover a Planned or Unplanned downtime? ¿ Have we separated on what to include and exclude as Planned and Unplanned downtime? ¿ Have we agreed on what we shall consider a breakdown and not a breakdown? ¿ Is everyone clear on the definition of breakdown and what do we include as breakdown or not especially in calculating MTBF, and MTTR where the denominator is the frequency of failures and breakdown. ¿ For manufacturing industries who suffered minor stoppages in their equipment, are these losses clearly separated from the breakdown especially when the downtime is prolonged due to no available technician. There are many interesting topics I have written that should provide the reader some clarification on t Selecting the Right KPI's for Maintenance ¿ Which Formula Should We Use on Availability? ¿ Why having an OEE of 85% is Not Always World-Class ¿ Clarity On When Do We Declare a Breakdown or Failure? ¿ Confusion Between Breakdowns and Minor Stoppages ¿ Where Can We Use MTBF? ¿ Limitations of MTBF ¿ A Deeper Meaning of Reliability ¿ Why MTTR and RCFA are the Opposite of Both Worlds? ¿ Mean Time to Set-up Explained ¿ Mean Time between Assists (MTBA) Explained ¿ The Most Important Measure for the Storeroom racy ¿ Other MRO Storeroom and Spare Parts KPIs ¿ Tracking Small things Matter Most ¿ Maintenance is as Strong as its Weakest Link ¿ Achieving World Class Maintenance Level Can Now Be Measured ¿ Improving the Breakdown Rate and MTBF ¿ Who Should Monitor the Overall Equipment Effectiveness ¿ Frequently Asked Questions on Maintenance Indices ¿ Tips on Maintenance Indices ¿ Treat Maintenance as a Business ¿ People are the Key In Improving These Maintenance Indices ¿ The Challenges of Today's Maintenance in This Global Pandemic ¿ The Difficulty in Standardizing These Measurements &a
Autorenporträt
Rolly is a seasoned international maintenance and reliability consultant with over 30 years of solid experience in the field. He has been invited to different countries and has conducted reliability and maintenance training in United Arab Emirates, Qatar, India, Malaysia, Indonesia, Brunei, Thailand, Nigeria, Bangladesh, South Africa, China, and Botswana. His maintenance training portfolio includes maintenance and reliability courses on TPM, Lubrication, Tribology, Condition-Based Maintenance, RCM, RCFA, TPM Planned Maintenance, Autonomous Maintenance 7 Steps, World Class Maintenance Management, The 12 Disciplines, Oil Contamination Control, Maintenance Indices, and KPI's, Maintenance and Reliability Management Strategies and much more. Rolly previously worked with Amkor Technology Philippines as a TPM Senior Engineer, an industry engaged in manufacturing Integrated Circuit products and spearheaded their Planned Maintenance organization, composed of maintenance managers and engineers. He was also responsible for dramatically reducing unplanned breakdowns in their TPM Journey and RCM implementation on their Facilities AHU units and substation equipment. Rolly is currently working as an independent reliability and maintenance consultant. Rolly is a graduate of Mechanical Engineering from Mapua Institute of Technology in the Philippines, batch 1985, and passed the licensure board examination the following year in 1986. With 30 years of solid experience, he had worked in various industries from shipping, woodworking, foundry, cast-iron machining, assembly lines, semiconductor manufacturing, and the mining industry. Here, he gained hands-on experience and understanding of TPM and RCM, respectively, a strategy from both the west and the east. His last corporate employment was in 2002, where he worked as a technical training specialist at Lepanto Consolidated Mining Industry. In 2005, Rolly retired early from the industry and decided to establish his own consulting business, RSA Reliability and Maintenance Consultancy Firm, where he dedicates his time and passion for working as an independent reliability and maintenance consultant. He provides in-house training, consultation, and facilitation to different maintenance and reliability best practices.