19,99 €
inkl. MwSt.

Versandfertig in 6-10 Tagen
payback
10 °P sammeln
  • Broschiertes Buch

Please note that the content of this book primarily consists of articles available from Wikipedia or other free sources online. Line 5 is an under construction line of the Milan Metro, Italy, that will connect the downtown Porta Garibaldi railway station with the north-eastern suburb, at the via Bignami-viale Testi intersection. The line will be built in several steps, with the first planned to open in 2012 and the fourth in 2015. Further extensions are planned. The line will operate using AnsaldoBreda Driverless Metro vehicles, the same of the Copenhagen Metro. The headway will be 75 seconds.

Andere Kunden interessierten sich auch für
Produktbeschreibung
Please note that the content of this book primarily consists of articles available from Wikipedia or other free sources online. Line 5 is an under construction line of the Milan Metro, Italy, that will connect the downtown Porta Garibaldi railway station with the north-eastern suburb, at the via Bignami-viale Testi intersection. The line will be built in several steps, with the first planned to open in 2012 and the fourth in 2015. Further extensions are planned. The line will operate using AnsaldoBreda Driverless Metro vehicles, the same of the Copenhagen Metro. The headway will be 75 seconds.