Minimize the Contractor's Claim
Muhammad Irfan Zafar
Broschiertes Buch

Minimize the Contractor's Claim

for Extension of Time in Storm Water Drainage Project in UAE

Versandkostenfrei!
Versandfertig in 6-10 Tagen
22,99 €
inkl. MwSt.
PAYBACK Punkte
11 °P sammeln!
The aim of this study is to identify ways to minimize the claim for extension of time in the storm water drainage projects in UAE.The Research is divided into seven chapters. The purpose of the first chapter is to elaborate on the reason for the study and to introduce the topic of the study along with its aims, objectives, and questions. The second chapter of the study focuses on the background of storm water drainage projects in UAE and claims in the construction projects. In the third chapter, the reasons for the extension of time have been analyzed. The third chapter also critically analyse...