This elaboration presents the research done in two office buildings. The obtained results were referenced to the design documentation. The results of the inspections and measurements on the mechanical ventilation system were discussed. Attention was paid to the divergence between the documentation and the installation status of both buildings. The problems encountered during the measurements were discussed.