The Penang Second Bridge is a new bridge under construction in Penang, Malaysia. It will connect Batu Kawan on the mainland Seberang Perai and Batu Maung on Penang Island. It will be the second bridge to link the island to the mainland after Penang Bridge. The total length of the RM 3 billion bridge is 24 km (15 miles) and will become the longest bridge in Malaysia and Southeast Asia. China Harbour Engineering Co Ltd (CHEC) expected to start work on the second Penang bridge in November 2007 for completion in 2011, but it was then postponed for completion in May 2012, as the construction started late in November 2008, due to the unreasonable demand from the local Authorities which caused the large delay. To reduce the cost of construction, its design was then modified to resemble the first cable stayed Penang Bridge.