Shield Tunneling in soft soil

Shield Tunneling in soft soil

Versandkostenfrei!
Versandfertig in 6-10 Tagen
24,99 €
inkl. MwSt.
PAYBACK Punkte
12 °P sammeln!
The construction of underground work depends on many factors. The most important factors are the geological, hydrological, and topographical conditions of the construction site. The application of design and construction measures must be grounded on these features of a certain construction area. Thus, it is important to conduct specific studies to determine the most suitable calculation method and construction method for the construction area. This book proposes a reasonable tunnel structure and construction method that can help to correct calculations based on the actual conditions to reduce ...