Rsmeans
Square Foot and Uniformat Assemblies Estimating
Rsmeans
Square Foot and Uniformat Assemblies Estimating
- Broschiertes Buch
- Merkliste
- Auf die Merkliste
- Bewerten Bewerten
- Teilen
- Produkt teilen
- Produkterinnerung
- Produkterinnerung
Now completely updated and revised to the UNIFORMAT II classification of estimating, this book is an essential reference for anyone who creates conceptual, construction, or appraisal estimates. You will learn: Time-saving techniques for producing reliable conceptual estimatesStep-by-step demonstration of building elements selection and its cost impact on the total budgetHow to use the RSMeans database for reliable feasibility studies and early project planning Also included is an overview of the CostWorks CD-ROM Square Foot and Assemblies Estimating software.
Andere Kunden interessierten sich auch für
- Unit Price Estimating Methods97,99 €
- RsmeansCost Planning and Estimating for Facilities Maintenance111,99 €
- Means Mechanical Estimating Methods: Takeoff & Pricing for HVAC & Plumbing, Updated 4th Edition88,99 €
- RsmeansMeans ADA Compliance Pricing Guide110,99 €
- Keith BrightInclusive Buildings, CD-ROM378,99 €
- RsmeansResidential and Light Commercial Construction Standards75,99 €
- RsmeansGreen Building135,99 €
-
-
-
Now completely updated and revised to the UNIFORMAT II classification of estimating, this book is an essential reference for anyone who creates conceptual, construction, or appraisal estimates. You will learn: Time-saving techniques for producing reliable conceptual estimatesStep-by-step demonstration of building elements selection and its cost impact on the total budgetHow to use the RSMeans database for reliable feasibility studies and early project planning Also included is an overview of the CostWorks CD-ROM Square Foot and Assemblies Estimating software.
Hinweis: Dieser Artikel kann nur an eine deutsche Lieferadresse ausgeliefert werden.
Hinweis: Dieser Artikel kann nur an eine deutsche Lieferadresse ausgeliefert werden.
Produktdetails
- Produktdetails
- Verlag: Wiley
- 3rd edition
- Seitenzahl: 370
- Erscheinungstermin: 17. August 2001
- Englisch
- Abmessung: 280mm x 216mm x 20mm
- Gewicht: 930g
- ISBN-13: 9780876290187
- ISBN-10: 0876290187
- Artikelnr.: 26016926
- Verlag: Wiley
- 3rd edition
- Seitenzahl: 370
- Erscheinungstermin: 17. August 2001
- Englisch
- Abmessung: 280mm x 216mm x 20mm
- Gewicht: 930g
- ISBN-13: 9780876290187
- ISBN-10: 0876290187
- Artikelnr.: 26016926
RSMeans is North America's leading supplier of construction cost information. A product line of Reed Construction Data, RSMeans provides accurate and up-to-date cost information that helps owners, developers, architects, engineers, contractors, and others to carefully and precisely project and control the cost of both new building construction and renovation projects. In addition to its collection of annual construction cost data books, RSMeans also offers construction estimating and facilities management seminars, electronic cost databases and software, reference books, and consulting services.
Contributors to This Edition.
Introduction.
How to Use This Book.
Chapter 1: Types of Estimates.
Four Types of Estimates.
Time and Cost of Estimating.
Chapter 2: Square Foot and Cubic Foot Estimates.
Using Square Foot/Cubic Foot Cost Data.
Some Examples.
Conclusion.
Chapter 3: Developing Structural Loads.
Developing Loads.
Assembly Versatility.
Soil Bearing Capacity.
Load Requirements.
Conclusion.
Assemblies Estimate: Three-Story Office Building.
Chapter 4: Substructure.
Spread Footings.
Concrete Piers.
Strip Footings.
Grade Beams.
Piles, Pile Caps, and Caissons.
Slab on Grade.
Assemblies Estimate: Three-Story Office Building.
Chapter 5: Superstructure.
Elevated Floor Assemblies.
Considerations in Selecting Foundation and Framing Systems.
Small versus Large Concrete Building.
Assemblies Estimate: Three-Story Office Building.
Chapter 6: Exterior Closure.
The Effects of Energy Requirements.
Exterior Wall Systems.
Assemblies Estimate: Three-Story Office Building.
Chapter 7: Roofing.
Selecting a Roof Assembly.
Calculation of Roof Area.
Flashing.
Roof Deck Insulation.
Conclusion.
Assemblies Estimate: Three-Story Office Building.
Chapter 8: Interiors.
Partitions.
Stairs.
Wall and Floor Finishes.
Assemblies Estimate: Three-Story Office Building.
Chapter 9: Conveying Systems.
Selecting and Estimating Elevators.
Safety.
Speed and Capacity.
Traffic.
Sizing Elevators.
Freight Elevators.
Service Elevators.
Federal Requirements.
Cost of Elevators.
Assemblies Estimate: Three-Story Office Building.
Chapter 10: Plumbing.
Estimating Plumbing Systems.
Assemblies Estimate: Three-Story Office Building.
Chapter 11: Heating, Ventilation, and Air Conditioning.
Heating.
Air Conditioning.
Quality and Complexity.
Assemblies Estimate: Three-Story Office Building.
Chapter 12: Fire Protection.
Classes of Fires.
Standpipes.
Sprinkler Systems.
Occupancy Hazards.
Assemblies Estimate: Three-Story Office Building.
Chapter 13: Electrical.
Budget Square Foot Costs.
Estimating Procedure.
Assemblies Estimate: Three-Story Office Building.
Chapter 14: Equipment, Furnishings, and Special Construction.
Equipment and Furnishings.
Special Construction.
Assemblies Estimate: Three-Story Office Building.
Chapter 15: Building Sitework.
Site Preparation.
Site Improvements.
Site Mechanical and Electrical Utilities.
Earthwork.
Utilities.
Pavements.
Assemblies Estimate: Three-Story Office Building.
Chapter 16: Estimate Summary.
The Installing Contractor's Overhead and Profit.
General Contractor's Mark-ups.
Assemblies Estimate: Three-Story Office Building.
Completed Estimate Summary.
Chapter 17: Overview/Estimate Analysis.
Breakdown of Square Foot Costs.
Cost Comparisons.
Component Comparison.
Estimating Accuracy.
Estimate Summary.
A Final Word.
Appendix.
Using UNIFORMAT II in Preliminary Design & Planning.
UNIFORMAT II Levels 3 and 4.
Overview of CostWorks.
Index.
Introduction.
How to Use This Book.
Chapter 1: Types of Estimates.
Four Types of Estimates.
Time and Cost of Estimating.
Chapter 2: Square Foot and Cubic Foot Estimates.
Using Square Foot/Cubic Foot Cost Data.
Some Examples.
Conclusion.
Chapter 3: Developing Structural Loads.
Developing Loads.
Assembly Versatility.
Soil Bearing Capacity.
Load Requirements.
Conclusion.
Assemblies Estimate: Three-Story Office Building.
Chapter 4: Substructure.
Spread Footings.
Concrete Piers.
Strip Footings.
Grade Beams.
Piles, Pile Caps, and Caissons.
Slab on Grade.
Assemblies Estimate: Three-Story Office Building.
Chapter 5: Superstructure.
Elevated Floor Assemblies.
Considerations in Selecting Foundation and Framing Systems.
Small versus Large Concrete Building.
Assemblies Estimate: Three-Story Office Building.
Chapter 6: Exterior Closure.
The Effects of Energy Requirements.
Exterior Wall Systems.
Assemblies Estimate: Three-Story Office Building.
Chapter 7: Roofing.
Selecting a Roof Assembly.
Calculation of Roof Area.
Flashing.
Roof Deck Insulation.
Conclusion.
Assemblies Estimate: Three-Story Office Building.
Chapter 8: Interiors.
Partitions.
Stairs.
Wall and Floor Finishes.
Assemblies Estimate: Three-Story Office Building.
Chapter 9: Conveying Systems.
Selecting and Estimating Elevators.
Safety.
Speed and Capacity.
Traffic.
Sizing Elevators.
Freight Elevators.
Service Elevators.
Federal Requirements.
Cost of Elevators.
Assemblies Estimate: Three-Story Office Building.
Chapter 10: Plumbing.
Estimating Plumbing Systems.
Assemblies Estimate: Three-Story Office Building.
Chapter 11: Heating, Ventilation, and Air Conditioning.
Heating.
Air Conditioning.
Quality and Complexity.
Assemblies Estimate: Three-Story Office Building.
Chapter 12: Fire Protection.
Classes of Fires.
Standpipes.
Sprinkler Systems.
Occupancy Hazards.
Assemblies Estimate: Three-Story Office Building.
Chapter 13: Electrical.
Budget Square Foot Costs.
Estimating Procedure.
Assemblies Estimate: Three-Story Office Building.
Chapter 14: Equipment, Furnishings, and Special Construction.
Equipment and Furnishings.
Special Construction.
Assemblies Estimate: Three-Story Office Building.
Chapter 15: Building Sitework.
Site Preparation.
Site Improvements.
Site Mechanical and Electrical Utilities.
Earthwork.
Utilities.
Pavements.
Assemblies Estimate: Three-Story Office Building.
Chapter 16: Estimate Summary.
The Installing Contractor's Overhead and Profit.
General Contractor's Mark-ups.
Assemblies Estimate: Three-Story Office Building.
Completed Estimate Summary.
Chapter 17: Overview/Estimate Analysis.
Breakdown of Square Foot Costs.
Cost Comparisons.
Component Comparison.
Estimating Accuracy.
Estimate Summary.
A Final Word.
Appendix.
Using UNIFORMAT II in Preliminary Design & Planning.
UNIFORMAT II Levels 3 and 4.
Overview of CostWorks.
Index.
Contributors to This Edition.
Introduction.
How to Use This Book.
Chapter 1: Types of Estimates.
Four Types of Estimates.
Time and Cost of Estimating.
Chapter 2: Square Foot and Cubic Foot Estimates.
Using Square Foot/Cubic Foot Cost Data.
Some Examples.
Conclusion.
Chapter 3: Developing Structural Loads.
Developing Loads.
Assembly Versatility.
Soil Bearing Capacity.
Load Requirements.
Conclusion.
Assemblies Estimate: Three-Story Office Building.
Chapter 4: Substructure.
Spread Footings.
Concrete Piers.
Strip Footings.
Grade Beams.
Piles, Pile Caps, and Caissons.
Slab on Grade.
Assemblies Estimate: Three-Story Office Building.
Chapter 5: Superstructure.
Elevated Floor Assemblies.
Considerations in Selecting Foundation and Framing Systems.
Small versus Large Concrete Building.
Assemblies Estimate: Three-Story Office Building.
Chapter 6: Exterior Closure.
The Effects of Energy Requirements.
Exterior Wall Systems.
Assemblies Estimate: Three-Story Office Building.
Chapter 7: Roofing.
Selecting a Roof Assembly.
Calculation of Roof Area.
Flashing.
Roof Deck Insulation.
Conclusion.
Assemblies Estimate: Three-Story Office Building.
Chapter 8: Interiors.
Partitions.
Stairs.
Wall and Floor Finishes.
Assemblies Estimate: Three-Story Office Building.
Chapter 9: Conveying Systems.
Selecting and Estimating Elevators.
Safety.
Speed and Capacity.
Traffic.
Sizing Elevators.
Freight Elevators.
Service Elevators.
Federal Requirements.
Cost of Elevators.
Assemblies Estimate: Three-Story Office Building.
Chapter 10: Plumbing.
Estimating Plumbing Systems.
Assemblies Estimate: Three-Story Office Building.
Chapter 11: Heating, Ventilation, and Air Conditioning.
Heating.
Air Conditioning.
Quality and Complexity.
Assemblies Estimate: Three-Story Office Building.
Chapter 12: Fire Protection.
Classes of Fires.
Standpipes.
Sprinkler Systems.
Occupancy Hazards.
Assemblies Estimate: Three-Story Office Building.
Chapter 13: Electrical.
Budget Square Foot Costs.
Estimating Procedure.
Assemblies Estimate: Three-Story Office Building.
Chapter 14: Equipment, Furnishings, and Special Construction.
Equipment and Furnishings.
Special Construction.
Assemblies Estimate: Three-Story Office Building.
Chapter 15: Building Sitework.
Site Preparation.
Site Improvements.
Site Mechanical and Electrical Utilities.
Earthwork.
Utilities.
Pavements.
Assemblies Estimate: Three-Story Office Building.
Chapter 16: Estimate Summary.
The Installing Contractor's Overhead and Profit.
General Contractor's Mark-ups.
Assemblies Estimate: Three-Story Office Building.
Completed Estimate Summary.
Chapter 17: Overview/Estimate Analysis.
Breakdown of Square Foot Costs.
Cost Comparisons.
Component Comparison.
Estimating Accuracy.
Estimate Summary.
A Final Word.
Appendix.
Using UNIFORMAT II in Preliminary Design & Planning.
UNIFORMAT II Levels 3 and 4.
Overview of CostWorks.
Index.
Introduction.
How to Use This Book.
Chapter 1: Types of Estimates.
Four Types of Estimates.
Time and Cost of Estimating.
Chapter 2: Square Foot and Cubic Foot Estimates.
Using Square Foot/Cubic Foot Cost Data.
Some Examples.
Conclusion.
Chapter 3: Developing Structural Loads.
Developing Loads.
Assembly Versatility.
Soil Bearing Capacity.
Load Requirements.
Conclusion.
Assemblies Estimate: Three-Story Office Building.
Chapter 4: Substructure.
Spread Footings.
Concrete Piers.
Strip Footings.
Grade Beams.
Piles, Pile Caps, and Caissons.
Slab on Grade.
Assemblies Estimate: Three-Story Office Building.
Chapter 5: Superstructure.
Elevated Floor Assemblies.
Considerations in Selecting Foundation and Framing Systems.
Small versus Large Concrete Building.
Assemblies Estimate: Three-Story Office Building.
Chapter 6: Exterior Closure.
The Effects of Energy Requirements.
Exterior Wall Systems.
Assemblies Estimate: Three-Story Office Building.
Chapter 7: Roofing.
Selecting a Roof Assembly.
Calculation of Roof Area.
Flashing.
Roof Deck Insulation.
Conclusion.
Assemblies Estimate: Three-Story Office Building.
Chapter 8: Interiors.
Partitions.
Stairs.
Wall and Floor Finishes.
Assemblies Estimate: Three-Story Office Building.
Chapter 9: Conveying Systems.
Selecting and Estimating Elevators.
Safety.
Speed and Capacity.
Traffic.
Sizing Elevators.
Freight Elevators.
Service Elevators.
Federal Requirements.
Cost of Elevators.
Assemblies Estimate: Three-Story Office Building.
Chapter 10: Plumbing.
Estimating Plumbing Systems.
Assemblies Estimate: Three-Story Office Building.
Chapter 11: Heating, Ventilation, and Air Conditioning.
Heating.
Air Conditioning.
Quality and Complexity.
Assemblies Estimate: Three-Story Office Building.
Chapter 12: Fire Protection.
Classes of Fires.
Standpipes.
Sprinkler Systems.
Occupancy Hazards.
Assemblies Estimate: Three-Story Office Building.
Chapter 13: Electrical.
Budget Square Foot Costs.
Estimating Procedure.
Assemblies Estimate: Three-Story Office Building.
Chapter 14: Equipment, Furnishings, and Special Construction.
Equipment and Furnishings.
Special Construction.
Assemblies Estimate: Three-Story Office Building.
Chapter 15: Building Sitework.
Site Preparation.
Site Improvements.
Site Mechanical and Electrical Utilities.
Earthwork.
Utilities.
Pavements.
Assemblies Estimate: Three-Story Office Building.
Chapter 16: Estimate Summary.
The Installing Contractor's Overhead and Profit.
General Contractor's Mark-ups.
Assemblies Estimate: Three-Story Office Building.
Completed Estimate Summary.
Chapter 17: Overview/Estimate Analysis.
Breakdown of Square Foot Costs.
Cost Comparisons.
Component Comparison.
Estimating Accuracy.
Estimate Summary.
A Final Word.
Appendix.
Using UNIFORMAT II in Preliminary Design & Planning.
UNIFORMAT II Levels 3 and 4.
Overview of CostWorks.
Index.