ICOLD Bulletin 194, Tailings Dam Safety, aims to assist the international community to further develop and adopt safe practices for tailings dam planning, design, construction, operation, and closure with a focus on the technical aspects that are mentioned but not fully developed in other National and Industry Guidelines and Standards.
ICOLD Bulletin 194, Tailings Dam Safety, aims to assist the international community to further develop and adopt safe practices for tailings dam planning, design, construction, operation, and closure with a focus on the technical aspects that are mentioned but not fully developed in other National and Industry Guidelines and Standards.Hinweis: Dieser Artikel kann nur an eine deutsche Lieferadresse ausgeliefert werden.
The Commission Internationale des Grands Barrages (CIGB) / International Commission on Large Dams (ICOLD) is a non-governmental International Organization which provides a forum for the exchange of knowledge and experience in dam engineering. The Organization leads the profession in ensuring that dams are built safely, efficiently, economically, and without detrimental effects on the environment. Its original aim was to encourage advances in the planning, design, construction, operation, and maintenance of large dams and their associated civil works, by collecting and disseminating relevant information and by studying related technical questions. Since the late sixties, focus was put on subjects of current concern such as dam safety, monitoring of performance, reanalysis of older dams and spillways, effects of ageing and environmental impact. More recently, new subjects include cost studies at the planning and construction stages, harnessing international rivers, information for the public at large, and financing.
Inhaltsangabe
FOREWORD PREFACE 1. INTRODUCTION 2. TAILINGS STORAGE FACILITY GOVERNANCE 3. CLOSURE 4. DAM CONSEQUENCE CLASSIFICATION 5. SITE CHARACTERIZATION 6. TAILINGS CHARACTERIZATION 7. DESIGN 8. RISK MANAGEMENT 9. DAM FAILURE / BREACH ANALYSIS 10. EMERGENCY PREPAREDNESS AND RESPONSE PLANNING 11. CONSTRUCTION 12. OPERATIONS 13. REFERENCES 14. DEFINITIONS APPENDICES AVANT-PROPOS PRÉFACE 1. INTRODUCTION 2. GOUVERNANCE DES INSTALLATIONS DE STOCKAGE DES RESIDUS 3. FERMETURE 4. CLASSEMENT DES BARRAGES EN FONCTION DES CONSEQUENCES D'UNE DEFAILLANCE 5. CARACTÉRISATION DU SITE 6. CARACTÉRISATION DES RÉSIDUS 7. CONCEPTION 8. GESTION DES RISQUES 9. ANALYSE DES DÉFAILLANCES ET DES RUPTURES DE BARRAGE 10. PRÉPARATION AUX SITUATIONS D'URGENCE ET PLANIFICATION DES INTERVENTIONS 11. CONSTRUCTION 12. EXPLOITATION 13. REFERENCES 14. DÉFINITIONS ANNEXES
FOREWORD PREFACE 1. INTRODUCTION 2. TAILINGS STORAGE FACILITY GOVERNANCE 3. CLOSURE 4. DAM CONSEQUENCE CLASSIFICATION 5. SITE CHARACTERIZATION 6. TAILINGS CHARACTERIZATION 7. DESIGN 8. RISK MANAGEMENT 9. DAM FAILURE / BREACH ANALYSIS 10. EMERGENCY PREPAREDNESS AND RESPONSE PLANNING 11. CONSTRUCTION 12. OPERATIONS 13. REFERENCES 14. DEFINITIONS APPENDICES AVANT-PROPOS PRÉFACE 1. INTRODUCTION 2. GOUVERNANCE DES INSTALLATIONS DE STOCKAGE DES RESIDUS 3. FERMETURE 4. CLASSEMENT DES BARRAGES EN FONCTION DES CONSEQUENCES D'UNE DEFAILLANCE 5. CARACTÉRISATION DU SITE 6. CARACTÉRISATION DES RÉSIDUS 7. CONCEPTION 8. GESTION DES RISQUES 9. ANALYSE DES DÉFAILLANCES ET DES RUPTURES DE BARRAGE 10. PRÉPARATION AUX SITUATIONS D'URGENCE ET PLANIFICATION DES INTERVENTIONS 11. CONSTRUCTION 12. EXPLOITATION 13. REFERENCES 14. DÉFINITIONS ANNEXES
Es gelten unsere Allgemeinen Geschäftsbedingungen: www.buecher.de/agb
Impressum
www.buecher.de ist ein Internetauftritt der buecher.de internetstores GmbH
Geschäftsführung: Monica Sawhney | Roland Kölbl | Günter Hilger
Sitz der Gesellschaft: Batheyer Straße 115 - 117, 58099 Hagen
Postanschrift: Bürgermeister-Wegele-Str. 12, 86167 Augsburg
Amtsgericht Hagen HRB 13257
Steuernummer: 321/neu