Breaking down the OEE methodology from a historical perspective, this book explores the overall effectiveness of machines and unveils novel design improvement methods, including hazard analysis, rate of change of failure analysis, failure rate finite element analysis, and theory of inventive problem solving. It covers loss of effectiveness, new
Breaking down the OEE methodology from a historical perspective, this book explores the overall effectiveness of machines and unveils novel design improvement methods, including hazard analysis, rate of change of failure analysis, failure rate finite element analysis, and theory of inventive problem solving. It covers loss of effectiveness, new
Acknowledgments Introduction 1 Total Preventive Maintenance 2 OEE: Understanding Loss of Effectiveness 3 Measuring OEE: A Traditional Simple Approach 4 Measuring OEE: The Reliability Approach 5 Improving OEE on Existing Machinery 6 Improving OEE on New Machinery: An Overview of Mechanical Reliability 7 Improving OEE on New Machinery: An Overview of Electrical Reliability 8 Improving OEE on New Machinery: Selected Methodologies 9 Reliability Growth 10 Maintenance Issues and Concerns 11 Requirements of Phase 1 of Implementing Equipment R&M: The Concept 12 Requirements of Phase 2 of Implementing Equipment R&M: Development and Design 13 Requirements of Phase 3 of Implementing Equipment R&M: Build and Install 14 Requirements for Implementing Equipment R&M in Phase 4 (Operations and Support) and Phase 15 Weibull Distribution Glossary Index About the Author
Acknowledgments Introduction 1 Total Preventive Maintenance 2 OEE: Understanding Loss of Effectiveness 3 Measuring OEE: A Traditional Simple Approach 4 Measuring OEE: The Reliability Approach 5 Improving OEE on Existing Machinery 6 Improving OEE on New Machinery: An Overview of Mechanical Reliability 7 Improving OEE on New Machinery: An Overview of Electrical Reliability 8 Improving OEE on New Machinery: Selected Methodologies 9 Reliability Growth 10 Maintenance Issues and Concerns 11 Requirements of Phase 1 of Implementing Equipment R&M: The Concept 12 Requirements of Phase 2 of Implementing Equipment R&M: Development and Design 13 Requirements of Phase 3 of Implementing Equipment R&M: Build and Install 14 Requirements for Implementing Equipment R&M in Phase 4 (Operations and Support) and Phase 15 Weibull Distribution Glossary Index About the Author
Es gelten unsere Allgemeinen Geschäftsbedingungen: www.buecher.de/agb
Impressum
www.buecher.de ist ein Shop der buecher.de GmbH & Co. KG Bürgermeister-Wegele-Str. 12, 86167 Augsburg Amtsgericht Augsburg HRA 13309