Marga Peeters
Time-To-Build
Interrelated Investment and Labour Demand Modelling With Applications to Six OECD Countries
Marga Peeters
Time-To-Build
Interrelated Investment and Labour Demand Modelling With Applications to Six OECD Countries
- Broschiertes Buch
- Merkliste
- Auf die Merkliste
- Bewerten Bewerten
- Teilen
- Produkt teilen
- Produkterinnerung
- Produkterinnerung
As large physical capital stock projects need long periods to be built, a time-to-build specification is incorporated in factor demand models. Time-to-build and adjustment costs dynamics are identified since by the first moving average dynamics, whereas by the latter autoregressive dynamics are induced. Empirical evidence for time-to-build is obtained from data from the Dutch construction industry and by the estimation result from the manufacturing industry of six OECD countries.
Andere Kunden interessierten sich auch für
- Chuangyin DangTriangulations and Simplicial Methods42,99 €
- Mario FalivaDynamic Model Analysis108,99 €
- Erik BrynjolfssonThe Second Machine Age24,99 €
- Erik BrynjolfssonThe Second Machine Age15,99 €
- Erik BrynjolfssonThe Second Machine Age9,99 €
- Ralf T. KreutzerDematerialisierung - Die Neuverteilung der Welt in Zeiten des digitalen Darwinismus34,90 €
- Christoph BartmannLeben im Büro18,90 €
-
-
-
As large physical capital stock projects need long periods to be built, a time-to-build specification is incorporated in factor demand models. Time-to-build and adjustment costs dynamics are identified since by the first moving average dynamics, whereas by the latter autoregressive dynamics are induced. Empirical evidence for time-to-build is obtained from data from the Dutch construction industry and by the estimation result from the manufacturing industry of six OECD countries.
Hinweis: Dieser Artikel kann nur an eine deutsche Lieferadresse ausgeliefert werden.
Hinweis: Dieser Artikel kann nur an eine deutsche Lieferadresse ausgeliefert werden.
Produktdetails
- Produktdetails
- Lecture Notes in Economics and Mathematical Systems 420
- Verlag: Springer / Springer Berlin Heidelberg / Springer, Berlin
- Artikelnr. des Verlages: 978-3-540-58809-2
- 1995.
- Seitenzahl: 220
- Erscheinungstermin: 17. Februar 1995
- Englisch
- Abmessung: 235mm x 155mm x 13mm
- Gewicht: 290g
- ISBN-13: 9783540588092
- ISBN-10: 3540588094
- Artikelnr.: 24946972
- Herstellerkennzeichnung
- Books on Demand GmbH
- In de Tarpen 42
- 22848 Norderstedt
- info@bod.de
- 040 53433511
- Lecture Notes in Economics and Mathematical Systems 420
- Verlag: Springer / Springer Berlin Heidelberg / Springer, Berlin
- Artikelnr. des Verlages: 978-3-540-58809-2
- 1995.
- Seitenzahl: 220
- Erscheinungstermin: 17. Februar 1995
- Englisch
- Abmessung: 235mm x 155mm x 13mm
- Gewicht: 290g
- ISBN-13: 9783540588092
- ISBN-10: 3540588094
- Artikelnr.: 24946972
- Herstellerkennzeichnung
- Books on Demand GmbH
- In de Tarpen 42
- 22848 Norderstedt
- info@bod.de
- 040 53433511
0 Overview.- 0.1 Introduction.- 0.2 Main research aims.- 0.3 Outline.- 1 Physical Capital Stock Investments and Labour Demand, Theoretical background on dynamic modelling.- 1.1 Introduction.- 1.2 Entrepreneurial behaviour.- 1.3 Entrepreneurial behaviour under neoclassical assumptions.- 1.4 Dynamics and the literature.- 1.5 Short summary and extensions.- 1.A Dynamics and interrelation in structures, equipment and labour in six OECD countries.- 2 Investment Gestation Lags, Construction lags, delivery lags and capital stock accumulation.- 2.1 Introduction.- 2.2 Construction lags.- 2.3 Time-to-build specification.- 2.4 The difference between construction and delivery lags.- 2.5 Statistical evidence on lead times.- 2.6 The calculation of physical capital stock series.- 2.7 Summary and conclusions.- 3 A Closed form Solution for a Model with Time-to-Build and Adjustment Costs, An application to the United States and Dutch manufacturing industry.- 3.1 Introduction.- 3.2 The model.- 3.3 Three univariate models for structures.- 3.4 The closed form solution of the trivariate model.- 3.5 Summary of the theoretical part and estimation aims.- 3.6 The estimation results.- 3.7 Summary and conclusions.- Appendices.- 3.A Solving the Euler equations of the multivariate model for the rational expectations.- 3.B Stationarity tests.- 4 Persistence, Asymmetries and Interrelation in Manufacturing Structures, Equipment and Labour Demand, An application to six OECD countries.- 4.1 Introduction.- 4.2 Descriptive statistics.- 4.3 A neoclassical factor demand model.- 4.4 Empirical analyses.- 4.5 Summary and conclusions.- 4.A Factor prices exogeneity, monopolistic competition or price influencing.- 5 Interrelations in Physical Capital Stock, Labour and Inventory Investments, An application to Frenchindustrial sectors.- 5.1 Introduction.- 5.2 Volatility and multi-cointegration.- 5.3 Two structural models with inventories.- 5.4 Empirical results.- 5.5 Conclusions.- 6 Summary, Conclusions and Shortcomings.- 6.1 Summary.- 6.2 Conclusions from empirical results.- 6.3 Shortcomings.- 6.4 Overall conclusions and some policy implications.- Data Appendix, Quarterly aggregate data.- I.1 Data sources.- I.2 Aggregate manufacturing industry data of six OECD countries.- I.2.1 Variables used as production factors and prices in chapter 3 and 4.- I.2.2 Data description.- I.2.3 Variables used as instruments in chapter 4.- I.3 Aggregate sectorial data of France (1970.I-1992.IV).- I.3.1 Variables used.- I.3.2 Data description.- I.3.3 Calculation of physical capital stock series.- Author Index.- List of Symbols.
0 Overview.- 0.1 Introduction.- 0.2 Main research aims.- 0.3 Outline.- 1 Physical Capital Stock Investments and Labour Demand, Theoretical background on dynamic modelling.- 1.1 Introduction.- 1.2 Entrepreneurial behaviour.- 1.3 Entrepreneurial behaviour under neoclassical assumptions.- 1.4 Dynamics and the literature.- 1.5 Short summary and extensions.- 1.A Dynamics and interrelation in structures, equipment and labour in six OECD countries.- 2 Investment Gestation Lags, Construction lags, delivery lags and capital stock accumulation.- 2.1 Introduction.- 2.2 Construction lags.- 2.3 Time-to-build specification.- 2.4 The difference between construction and delivery lags.- 2.5 Statistical evidence on lead times.- 2.6 The calculation of physical capital stock series.- 2.7 Summary and conclusions.- 3 A Closed form Solution for a Model with Time-to-Build and Adjustment Costs, An application to the United States and Dutch manufacturing industry.- 3.1 Introduction.- 3.2 The model.- 3.3 Three univariate models for structures.- 3.4 The closed form solution of the trivariate model.- 3.5 Summary of the theoretical part and estimation aims.- 3.6 The estimation results.- 3.7 Summary and conclusions.- Appendices.- 3.A Solving the Euler equations of the multivariate model for the rational expectations.- 3.B Stationarity tests.- 4 Persistence, Asymmetries and Interrelation in Manufacturing Structures, Equipment and Labour Demand, An application to six OECD countries.- 4.1 Introduction.- 4.2 Descriptive statistics.- 4.3 A neoclassical factor demand model.- 4.4 Empirical analyses.- 4.5 Summary and conclusions.- 4.A Factor prices exogeneity, monopolistic competition or price influencing.- 5 Interrelations in Physical Capital Stock, Labour and Inventory Investments, An application to Frenchindustrial sectors.- 5.1 Introduction.- 5.2 Volatility and multi-cointegration.- 5.3 Two structural models with inventories.- 5.4 Empirical results.- 5.5 Conclusions.- 6 Summary, Conclusions and Shortcomings.- 6.1 Summary.- 6.2 Conclusions from empirical results.- 6.3 Shortcomings.- 6.4 Overall conclusions and some policy implications.- Data Appendix, Quarterly aggregate data.- I.1 Data sources.- I.2 Aggregate manufacturing industry data of six OECD countries.- I.2.1 Variables used as production factors and prices in chapter 3 and 4.- I.2.2 Data description.- I.2.3 Variables used as instruments in chapter 4.- I.3 Aggregate sectorial data of France (1970.I-1992.IV).- I.3.1 Variables used.- I.3.2 Data description.- I.3.3 Calculation of physical capital stock series.- Author Index.- List of Symbols.