39,99 €
Statt 49,99 €**
39,99 €
inkl. MwSt.
**Preis der gedruckten Ausgabe (Broschiertes Buch)
Sofort per Download lieferbar
payback
0 °P sammeln
39,99 €
Statt 49,99 €**
39,99 €
inkl. MwSt.
**Preis der gedruckten Ausgabe (Broschiertes Buch)
Sofort per Download lieferbar

Alle Infos zum eBook verschenken
payback
0 °P sammeln
Als Download kaufen
Statt 49,99 €****
39,99 €
inkl. MwSt.
**Preis der gedruckten Ausgabe (Broschiertes Buch)
Sofort per Download lieferbar
payback
0 °P sammeln
Jetzt verschenken
Statt 49,99 €****
39,99 €
inkl. MwSt.
**Preis der gedruckten Ausgabe (Broschiertes Buch)
Sofort per Download lieferbar

Alle Infos zum eBook verschenken
payback
0 °P sammeln
  • Format: PDF

There are various reasons why the road asset in Zambia has been deteriorating over the past five decades since independence. Much effort to restore the road asset to its original value and keep it maintained in a good and safe condition was initiated in mid 1990s with the launch of the Road Sector Investment Plan - Phase I, which was immediately followed by the launch of a Phase II to run from 2003 to 2013. It is my appreciation that many diagnostic studies into road financing strategies which could have led to inefficient road asset management in Zambia have been undertaken, and various…mehr

Produktbeschreibung
There are various reasons why the road asset in Zambia has been deteriorating over the past five decades since independence. Much effort to restore the road asset to its original value and keep it maintained in a good and safe condition was initiated in mid 1990s with the launch of the Road Sector Investment Plan - Phase I, which was immediately followed by the launch of a Phase II to run from 2003 to 2013. It is my appreciation that many diagnostic studies into road financing strategies which could have led to inefficient road asset management in Zambia have been undertaken, and various solutions tendered. The author takes cognizance that resource mobilization for road construction and maintenance, and subsequent allocation to respective road programs can often be problematic for an emerging country like Zambia. It has the potential to lead to inefficiencies in road asset management as has evidently been demonstrated in the declining road asset value over time. The political, as well as the economic, landscape plays a vital role in resource mobilization and allocation strategies as much as the institutional and the legal framework do. The failure to clear the backlog of maintenance which normally results, largely, from deferment of scheduled maintenance due to insufficient annual budgetary allocation to the road sector maintenance programs has led to the significant deterioration in road network condition. Exorbitant road construction costs have posed additional challenges to the fiscus, thereby constraining both the quantity and quality of road infrastructure that could be constructed and maintained at any given time. Recent policy drives have been categorical in their preference of new road construction aimed at linking Zambia, over road maintenance, which plays a pivotal role in road asset management. This creates a perception that policy pronouncements are at variance to policy documents which promote sustainable economic development through efficient road investments and could be seen as being paradoxical in that the actual financing strategies are skewed towards road construction, a recipe of comfort for the next election challenge due to increased visibility on the ground, rather than to maintenance, as an astute and effective way of managing the road asset. The difficult of establishing congruence between government pronouncements and actual road business strategies in the implementing agencies has, over the [...]

Dieser Download kann aus rechtlichen Gründen nur mit Rechnungsadresse in A, B, BG, CY, CZ, D, DK, EW, E, FIN, F, GR, HR, H, IRL, I, LT, L, LR, M, NL, PL, P, R, S, SLO, SK ausgeliefert werden.

Autorenporträt
Engineer Dr. Yohane Tembo is a professional Civil Engineer who specializes in the design, management and monitoring of roads projects in Zambia. Currently, he works for the Zambia National Road Fund Agency. His previous appointments include those of Principal Engineer - Design & Traffic in the Zambia Road Development Agency, as well as Quality Assurance Manager in Phoenix Contractors Denmark A/S, having held various positions of Design Engineer and Resident Engineer in different consulting firms on a number of large-scale road construction projects. His academic qualifications include a Bachelor of Engineering in Civil and Environmental Engineering from the University of Zambia in Lusaka (2), a Masters in Civil Engineering (specializing in Transportation Engineering) from the University of Stellenbosch in Cape Town (21) and a Doctor of Philosophy in Transportation Economics at Atlantic International University, United States (214). He is professionally registered as a Member with both the Engineering Institution of Zambia and the Engineers' Registration Board.