15,99 €
Statt 17,95 €**
15,99 €
inkl. MwSt.
**Preis der gedruckten Ausgabe (Broschiertes Buch)
Sofort per Download lieferbar
payback
0 °P sammeln
15,99 €
Statt 17,95 €**
15,99 €
inkl. MwSt.
**Preis der gedruckten Ausgabe (Broschiertes Buch)
Sofort per Download lieferbar

Alle Infos zum eBook verschenken
payback
0 °P sammeln
Als Download kaufen
Statt 17,95 €****
15,99 €
inkl. MwSt.
**Preis der gedruckten Ausgabe (Broschiertes Buch)
Sofort per Download lieferbar
payback
0 °P sammeln
Jetzt verschenken
Statt 17,95 €****
15,99 €
inkl. MwSt.
**Preis der gedruckten Ausgabe (Broschiertes Buch)
Sofort per Download lieferbar

Alle Infos zum eBook verschenken
payback
0 °P sammeln
  • Format: ePub

Seminar paper from the year 2014 in the subject Engineering - General, grade: A, Robert Gordon University Aberdeen, course: Wells, language: English, abstract: This report presents the development plan for Gazelle gas condensate reservoir. The viable development option for the field and the main items of equipment selected for the chosen option were presented. The field development option was selected after analysing two different options: 1. Use of FPSO with shuttle tanker and 2. Steel Piled Jacket with pipelines based on technical viability, cost and commerciality aspect. Based on these and…mehr

  • Geräte: eReader
  • ohne Kopierschutz
  • eBook Hilfe
  • Größe: 0.79MB
Produktbeschreibung
Seminar paper from the year 2014 in the subject Engineering - General, grade: A, Robert Gordon University Aberdeen, course: Wells, language: English, abstract: This report presents the development plan for Gazelle gas condensate reservoir. The viable development option for the field and the main items of equipment selected for the chosen option were presented. The field development option was selected after analysing two different options: 1. Use of FPSO with shuttle tanker and 2. Steel Piled Jacket with pipelines based on technical viability, cost and commerciality aspect. Based on these and some assumptions made, the development of the field using Steel Piled Jacket and pipeline for gas and condensate export was selected. With this option, transportation of condensate to Fort Thompson is done via pipeline and export of gas to Fort Thompson, Gazelle and other fields is also achieved via pipelines. The major components of the facility development project will include Piled jacket, drilling module, the fluid processing equipment such as separators, glycol dehydration units, gas turbines, centrifugal pumps and compressors, orifice and turbine meters.

Dieser Download kann aus rechtlichen Gründen nur mit Rechnungsadresse in A, B, BG, CY, CZ, D, DK, EW, E, FIN, F, GR, HR, H, IRL, I, LT, L, LR, M, NL, PL, P, R, S, SLO, SK ausgeliefert werden.