The first book on second-generation Drum-Buffer-Rope, this work describes the simplest, most efficient methods for reducing manufacturing cycle time and increasing speed. Fully illustrated and with numerous examples, case studies, and manufacturing scenarios, it is so easy to read that even the novice can understand it. The Management Interactive Case Study Simulator (MICSS) is included with the book. Available via download, the simulator sets up a virtual company to test the processes covered in the book.
Dieser Download kann aus rechtlichen Gründen nur mit Rechnungsadresse in A, B, BG, CY, CZ, D, DK, EW, E, FIN, F, GR, HR, H, IRL, I, LT, L, LR, M, NL, PL, P, R, S, SLO, SK ausgeliefert werden.