5,99 €
5,99 €
inkl. MwSt.
Sofort per Download lieferbar
payback
0 °P sammeln
5,99 €
5,99 €
inkl. MwSt.
Sofort per Download lieferbar

Alle Infos zum eBook verschenken
payback
0 °P sammeln
Als Download kaufen
5,99 €
inkl. MwSt.
Sofort per Download lieferbar
payback
0 °P sammeln
Jetzt verschenken
5,99 €
inkl. MwSt.
Sofort per Download lieferbar

Alle Infos zum eBook verschenken
payback
0 °P sammeln
  • Format: ePub

An in-depth preparation guide for PMP® and CAPM® exams covering Precedence Diagramming Method/Activity-On-Node concepts and their analysis using the Critical Path Method. This guide explains the concepts with illustrated examples with emphasis on particular situations. Explanation of concepts through stepwise solved examples will provide readers with the hands-on ability for their application. This guide will serve as a launch pad for advanced study in this area beyond the requirements of the two exams.

  • Geräte: eReader
  • mit Kopierschutz
  • eBook Hilfe
  • Größe: 2.41MB
  • FamilySharing(5)
Produktbeschreibung
An in-depth preparation guide for PMP® and CAPM® exams covering Precedence Diagramming Method/Activity-On-Node concepts and their analysis using the Critical Path Method. This guide explains the concepts with illustrated examples with emphasis on particular situations. Explanation of concepts through stepwise solved examples will provide readers with the hands-on ability for their application. This guide will serve as a launch pad for advanced study in this area beyond the requirements of the two exams.


Dieser Download kann aus rechtlichen Gründen nur mit Rechnungsadresse in A, B, CY, CZ, D, DK, EW, E, FIN, F, GR, H, IRL, I, LT, L, LR, M, NL, PL, P, R, S, SLO, SK ausgeliefert werden.