36,99 €
Statt 47,95 €**
36,99 €
inkl. MwSt.
**Preis der gedruckten Ausgabe (Broschiertes Buch)
Sofort per Download lieferbar
payback
0 °P sammeln
36,99 €
Statt 47,95 €**
36,99 €
inkl. MwSt.
**Preis der gedruckten Ausgabe (Broschiertes Buch)
Sofort per Download lieferbar

Alle Infos zum eBook verschenken
payback
0 °P sammeln
Als Download kaufen
Statt 47,95 €****
36,99 €
inkl. MwSt.
**Preis der gedruckten Ausgabe (Broschiertes Buch)
Sofort per Download lieferbar
payback
0 °P sammeln
Jetzt verschenken
Statt 47,95 €****
36,99 €
inkl. MwSt.
**Preis der gedruckten Ausgabe (Broschiertes Buch)
Sofort per Download lieferbar

Alle Infos zum eBook verschenken
payback
0 °P sammeln
  • Format: PDF

Master's Thesis from the year 2016 in the subject Business economics - Business Management, Corporate Governance, grade: 60.02, Kwame Nkrumah University of Science and Technology, course: Msc Construction Management, language: English, abstract: To support in addressing this issue, this work was planned with the aim to recommend strategies for curbing ineffective management of safety on construction sites. The construction industry is inherently risky, with a substantial number of accidents. Moreover, most construction firms aim at completing projects on time, especially with different…mehr

Produktbeschreibung
Master's Thesis from the year 2016 in the subject Business economics - Business Management, Corporate Governance, grade: 60.02, Kwame Nkrumah University of Science and Technology, course: Msc Construction Management, language: English, abstract: To support in addressing this issue, this work was planned with the aim to recommend strategies for curbing ineffective management of safety on construction sites. The construction industry is inherently risky, with a substantial number of accidents. Moreover, most construction firms aim at completing projects on time, especially with different projects at hand thereby neglecting the safety aspect of the workers. In most Ghanaian construction companies, adequate concentration is not allocated to the areas of health and safety and this has been a great problem over the years in which Accra Metropolis is no exception. In order to achieve the said aim, the objectives set up include; to identify the possible causes of accident as a result of ineffective management of safety, to determine the level of accidents caused by ineffective management of safety at the construction sites and to identify strategies to curb ineffective management of safety at the construction sites. Survey questionnaires were administrated to five major construction companies in the Greater Accra Region in which the data collected was also analyzed with the Statistical Package for Social Science (SPSS) and the Relative Importance Index (RII) was also used in ranking. It was therefore revealed from the findings that poor planning at site, unsafe working conditions with others are some of the major causes of accident at site. In addition, falling victims were identified as the most serious level of accident on site. Construction companies should consider the need for special training for workers and also to create a group of internal health and safety monitory experts were some of the recommendations made.

Dieser Download kann aus rechtlichen Gründen nur mit Rechnungsadresse in A, B, BG, CY, CZ, D, DK, EW, E, FIN, F, GR, HR, H, IRL, I, LT, L, LR, M, NL, PL, P, R, S, SLO, SK ausgeliefert werden.