Sie sind bereits eingeloggt. Klicken Sie auf 2. tolino select Abo, um fortzufahren.
Bitte loggen Sie sich zunächst in Ihr Kundenkonto ein oder registrieren Sie sich bei bücher.de, um das eBook-Abo tolino select nutzen zu können.
Breaking down the OEE methodology from a historical perspective, this book explores the overall effectiveness of machines and unveils novel design improvement methods, including hazard analysis, rate of change of failure analysis, failure rate finite element analysis, and theory of inventive problem solving. It covers loss of effectiveness, new
Breaking down the OEE methodology from a historical perspective, this book explores the overall effectiveness of machines and unveils novel design improvement methods, including hazard analysis, rate of change of failure analysis, failure rate finite element analysis, and theory of inventive problem solving. It covers loss of effectiveness, new
Dieser Download kann aus rechtlichen Gründen nur mit Rechnungsadresse in A, B, BG, CY, CZ, D, DK, EW, E, FIN, F, GR, HR, H, IRL, I, LT, L, LR, M, NL, PL, P, R, S, SLO, SK ausgeliefert werden.
Die Herstellerinformationen sind derzeit nicht verfügbar.
Autorenporträt
D.H. Stamatis
Inhaltsangabe
Acknowledgments, Introduction, 1 Total Preventive Maintenance, 2 OEE: Understanding Loss of Effectiveness, 3 Measuring OEE: A Traditional Simple Approach, 4 Measuring OEE: The Reliability Approach, 5 Improving OEE on Existing Machinery, 6 Improving OEE on New Machinery: An Overview of Mechanical Reliability, 7 Improving OEE on New Machinery: An Overview of Electrical Reliability, 8 Improving OEE on New Machinery: Selected Methodologies, 9 Reliability Growth, 10 Maintenance Issues and Concerns, 11 Requirements of Phase 1 of Implementing Equipment R&M: The Concept, 12 Requirements of Phase 2 of Implementing Equipment R&M: Development and Design, 13 Requirements of Phase 3 of Implementing Equipment R&M: Build and Install, 14 Requirements for Implementing Equipment R&M in Phase 4 (Operations and Support) and Phase, 15 Weibull Distribution, Glossary, Index, About the Author
Acknowledgments, Introduction, 1 Total Preventive Maintenance, 2 OEE: Understanding Loss of Effectiveness, 3 Measuring OEE: A Traditional Simple Approach, 4 Measuring OEE: The Reliability Approach, 5 Improving OEE on Existing Machinery, 6 Improving OEE on New Machinery: An Overview of Mechanical Reliability, 7 Improving OEE on New Machinery: An Overview of Electrical Reliability, 8 Improving OEE on New Machinery: Selected Methodologies, 9 Reliability Growth, 10 Maintenance Issues and Concerns, 11 Requirements of Phase 1 of Implementing Equipment R&M: The Concept, 12 Requirements of Phase 2 of Implementing Equipment R&M: Development and Design, 13 Requirements of Phase 3 of Implementing Equipment R&M: Build and Install, 14 Requirements for Implementing Equipment R&M in Phase 4 (Operations and Support) and Phase, 15 Weibull Distribution, Glossary, Index, About the Author
Es gelten unsere Allgemeinen Geschäftsbedingungen: www.buecher.de/agb
Impressum
www.buecher.de ist ein Internetauftritt der buecher.de internetstores GmbH
Geschäftsführung: Monica Sawhney | Roland Kölbl | Günter Hilger
Sitz der Gesellschaft: Batheyer Straße 115 - 117, 58099 Hagen
Postanschrift: Bürgermeister-Wegele-Str. 12, 86167 Augsburg
Amtsgericht Hagen HRB 13257
Steuernummer: 321/5800/1497
USt-IdNr: DE450055826