18,49 €
18,49 €
inkl. MwSt.
Sofort per Download lieferbar
payback
0 °P sammeln
18,49 €
18,49 €
inkl. MwSt.
Sofort per Download lieferbar

Alle Infos zum eBook verschenken
payback
0 °P sammeln
Als Download kaufen
18,49 €
inkl. MwSt.
Sofort per Download lieferbar
payback
0 °P sammeln
Jetzt verschenken
18,49 €
inkl. MwSt.
Sofort per Download lieferbar

Alle Infos zum eBook verschenken
payback
0 °P sammeln
  • Format: ePub

True Down Time Cost Analysis - 2nd Edition eBook
ESBN: F36-047B-2151-10B2
Description:
True Downtime Costs Analysis focuses on costing methods and techniques that quantify activities that previously fell under the indirect cost definition, like the hidden cost of outsourcing, warranties, etc. This technique is necessary for bottleneck management in piece manufacturing and other industries.
Authors Don Fitchett and Mike Sondalini coauthor the extension of the original eBook "The True Cost of Manufacturing Downtime" (ISBN 1-933047-15-1). This second edition includes an action
…mehr

  • Geräte: eReader
  • mit Kopierschutz
  • eBook Hilfe
  • Größe: 1.81MB
Produktbeschreibung
True Down Time Cost Analysis - 2nd Edition eBook

ESBN: F36-047B-2151-10B2

Description:

True Downtime Costs Analysis focuses on costing methods and techniques that quantify activities that previously fell under the indirect cost definition, like the hidden cost of outsourcing, warranties, etc. This technique is necessary for bottleneck management in piece manufacturing and other industries.

Authors Don Fitchett and Mike Sondalini coauthor the extension of the original eBook "The True Cost of Manufacturing Downtime" (ISBN 1-933047-15-1). This second edition includes an action plan to utilize existing shop floor data collection to monitor manufacturing processes and associated costs.

'True Downtime Cost Analysis (TDC)' is the final piece to the lean manufacturing puzzle and a great cost justification tool for maintenance managers and production managers, right up to general managers, to make changes in their operations that move their companies toward using better practices.

The OEE and TEEP chapter discusses this benchmarking process tool from a return on capital employed (ROCE) point of view. In line with this eBook's "True" perspective, the authors clarify using OEE and TEEP properly. The action plan chapter ends with a detailed example plan followed by an additional example of implementing TDC in your facility to its fullest extent.

"The TDC method used reveals many cost-saving opportunities that would not be evident using standard time and material cost tracking methods that hide many costs under the indirect cost definition."

Extracts and summaries from this 101-page eBook have been published as industrial engineering articles in many engineering and management journals and industry websites worldwide.

(Control Engineering, Instrumentation and Control Journal, Facilities Engineering Journal, Pumps & Systems Magazine, Pharma Manufacturing Magazine, Hong Kong Engineer, and more ...)


Dieser Download kann aus rechtlichen Gründen nur mit Rechnungsadresse in A, B, CY, CZ, D, DK, EW, E, FIN, F, GR, H, IRL, I, LT, L, LR, M, NL, PL, P, R, S, SLO, SK ausgeliefert werden.