This book covers execution of mega industrial projects in oil/gas industries covering engineering, procurement, construction, commissioning and performance testing and covers various tasks under each discipline to define the detailed scope of work, supplies and services.
This book covers execution of mega industrial projects in oil/gas industries covering engineering, procurement, construction, commissioning and performance testing and covers various tasks under each discipline to define the detailed scope of work, supplies and services.Hinweis: Dieser Artikel kann nur an eine deutsche Lieferadresse ausgeliefert werden.
Soosaiya Anthreas graduated from CIT in Mechanical Engineering. He has thirty four years of experience from mega industrial projects in the field of project development, project management and project construction. He worked in global EPC companies like Samsung Engineering and Technip FMC. As a weekend novelist, he published his first literary fiction novel, The Dance of the Sea. He lives in Chennai with wife and son..
Inhaltsangabe
SECTION I PLANNING AND EXECUTION IN LEVEL 3. 1. Management, Control and Administration. 2. HSE, Social and Security. 3. Services and Facilities to Owner. 4. Engineering. 5. Procurement and Supply. 6. Transport, Logistic and Storage. 7. Construction. 8. Pre-Commissioning. 9. Commissioning, Start-up and Performance Test. 10. Temporary Facilities. SECTION II COMMERCIAL ASPECTS. 11. Commencement Date and Effective Dates. 12. Extension of Time. 13. Professionally Handling Large Claims. 14. Prolongation and Disruption Costs. 15. Penalty/Interest for Payment Delays. 16. Force Majeure. 17. Concurrent Delays. 18. Hedging against Currency Fluctuations. 19. Indemnity. 20. Consequential, Indirect Damages. 21. Laws and Regulations. 22. Escalation. 23. Liens. 24. Total Liability. 25. Payment Terms. 26. Planning. 27. Progress Measurement. 28. EOT claim. 29. Interpretation Rules. 30. Change/Variations/Trend Notices. 31. Contract Price below Floor Price and Consequences. 32. Owner's Delay on Document Approval. 33. Insurances. SECTION III TECHNICAL ASPECTS. 34. Life Cycle Cost Analysis (LCCA). 35. Consequences of Delayed Rigless Test on Wells (Owner Delays). 36. Strategy for using Non-Spec Feedstock for Commissioning. 37. Gas In and Authority Check points. 38. Value Engineering. 39. Design Defect, Construction Defect and Damages. 40. NDT (Non-Destructive Testing). 41. Destructive Testing. 42. Hydrostatic Leak Test. 43. Heavy Lift Load Sharing for Cranes. SECTION IV GLOSSARY OF ABBREVIATIONS, NAMES AND MEANING. APPENDIX. 1. Project Organization. 2. Contract Price Weight Factor. 3. Monthly Status Report Contents. 4. Material Requisition Cycle(MR). 5. FEED Deliverable List. 6. Process Block Flow Diagram. 7. Document Categories. 8. Claims and Liens Release Letter. 9. Prolongation and Disruption Cost: Hudson formula. 10. A typical list of Procedures and Plans. 11. Total Plant Break down into Areas.
SECTION I PLANNING AND EXECUTION IN LEVEL 3. 1. Management, Control and Administration. 2. HSE, Social and Security. 3. Services and Facilities to Owner. 4. Engineering. 5. Procurement and Supply. 6. Transport, Logistic and Storage. 7. Construction. 8. Pre-Commissioning. 9. Commissioning, Start-up and Performance Test. 10. Temporary Facilities. SECTION II COMMERCIAL ASPECTS. 11. Commencement Date and Effective Dates. 12. Extension of Time. 13. Professionally Handling Large Claims. 14. Prolongation and Disruption Costs. 15. Penalty/Interest for Payment Delays. 16. Force Majeure. 17. Concurrent Delays. 18. Hedging against Currency Fluctuations. 19. Indemnity. 20. Consequential, Indirect Damages. 21. Laws and Regulations. 22. Escalation. 23. Liens. 24. Total Liability. 25. Payment Terms. 26. Planning. 27. Progress Measurement. 28. EOT claim. 29. Interpretation Rules. 30. Change/Variations/Trend Notices. 31. Contract Price below Floor Price and Consequences. 32. Owner's Delay on Document Approval. 33. Insurances. SECTION III TECHNICAL ASPECTS. 34. Life Cycle Cost Analysis (LCCA). 35. Consequences of Delayed Rigless Test on Wells (Owner Delays). 36. Strategy for using Non-Spec Feedstock for Commissioning. 37. Gas In and Authority Check points. 38. Value Engineering. 39. Design Defect, Construction Defect and Damages. 40. NDT (Non-Destructive Testing). 41. Destructive Testing. 42. Hydrostatic Leak Test. 43. Heavy Lift Load Sharing for Cranes. SECTION IV GLOSSARY OF ABBREVIATIONS, NAMES AND MEANING. APPENDIX. 1. Project Organization. 2. Contract Price Weight Factor. 3. Monthly Status Report Contents. 4. Material Requisition Cycle(MR). 5. FEED Deliverable List. 6. Process Block Flow Diagram. 7. Document Categories. 8. Claims and Liens Release Letter. 9. Prolongation and Disruption Cost: Hudson formula. 10. A typical list of Procedures and Plans. 11. Total Plant Break down into Areas.
Es gelten unsere Allgemeinen Geschäftsbedingungen: www.buecher.de/agb
Impressum
www.buecher.de ist ein Internetauftritt der buecher.de internetstores GmbH
Geschäftsführung: Monica Sawhney | Roland Kölbl | Günter Hilger
Sitz der Gesellschaft: Batheyer Straße 115 - 117, 58099 Hagen
Postanschrift: Bürgermeister-Wegele-Str. 12, 86167 Augsburg
Amtsgericht Hagen HRB 13257
Steuernummer: 321/5800/1497
USt-IdNr: DE450055826